forked from lix-project/hydra
4ed877360b
Each jobset now has a "scheduling share" that determines how much of the build farm's time it is entitled to. For instance, if a jobset has 100 shares and the total number of shares of all jobsets is 1000, it's entitled to 10% of the build farm's time. When there is a free build slot for a given system type, the queue runner will select the jobset that is furthest below its scheduling share over a certain time window (currently, the last day). Withing that jobset, it will pick the build with the highest priority. So meta.schedulingPriority now only determines the order of builds within a jobset, not between jobsets. This makes it much easier to prioritise one jobset over another (e.g. nixpkgs:trunk over nixpkgs:stdenv). |
||
---|---|---|
.. | ||
hydra-build | ||
hydra-control | ||
hydra-create | ||
hydra-eval-guile-jobs.in | ||
hydra-evaluator | ||
hydra-init | ||
hydra-queue-runner | ||
hydra-s3-backup-collect-garbage | ||
hydra-server | ||
hydra-update-gc-roots | ||
Makefile.am | ||
nix-prefetch-bzr | ||
nix-prefetch-git | ||
nix-prefetch-hg |