Commit graph

368 commits

Author SHA1 Message Date
Eelco Dolstra 0daba6bb89 In the jobset evals lists, show what inputs changed between consecutive evals 2012-04-15 20:06:42 +00:00
Eelco Dolstra b9824ca422 Cleanup 2012-04-15 18:47:22 +00:00
Eelco Dolstra fd50ac1d4e Store the inputs of each evaluation in the database
Achtung: this requires a schema upgrade via "hydra-init".
2012-04-15 18:36:36 +00:00
Eelco Dolstra 794602d7ce Drop unused "tag" column
It was intended for CVS inputs but never used.
2012-04-15 12:42:46 +00:00
Rob Vermaas 516a644a7f Merge branch 'master' into bootstrap 2012-04-13 11:55:49 +02:00
Rob Vermaas bb4f470348 Remove default logo, replaced by text for now. Hide template in jobset edit. 2012-04-13 11:47:05 +02:00
Rob Vermaas f63e9a63b4 Replace last 5 builds on jobset page with last 5 evaluations. Moved hide/unhide and evaluate options to jobset topmenu. 2012-04-13 11:26:37 +02:00
Rob Vermaas b81aa89260 Replace old logo with Nix/NixOS logo. 2012-04-13 10:33:11 +02:00
Rob Vermaas 9a1f38e06e Remove comments, re-add logo. 2012-04-13 10:05:02 +02:00
Ludovic Courtès 6e62d9b7b5 Allow use of a single Git clone for several branches.
This reinstates commit 53329ecc61, but
uses "git pull --all", instead of "git fetch --all", so that local
tracking branches get updated too.
2012-04-12 16:55:33 +02:00
Rob Vermaas ed23a6e6d3 Add branch to local clone path of git repositories for now. 2012-04-10 10:06:12 +02:00
Rob Vermaas 79211d5efe Revert "Use git fetch --all to update local clone in stead of git pull. Also, do not use --branch in initial clone."
This reverts commit 53329ecc61.
2012-04-10 10:04:22 +02:00
Rob Vermaas 53329ecc61 Use git fetch --all to update local clone in stead of git pull. Also, do not use --branch in initial clone. 2012-04-05 15:49:48 +02:00
Eelco Dolstra 8b88ce19c2 Huuuge speedup in the Hydra evaluator
The check to see whether a build had been scheduled in a previous
evaluation took about 200 ms for the nixpkgs:trunk jobset.  Given
that it has more than 15000 builds, this added up to a lot.  Now
it takes 0.2 ms per build.
2012-04-04 17:29:03 +02:00
Eelco Dolstra e9dd3158a0 Propagate URI parameters
This allows URIs like

  http://hydra.nixos.org/jobset/nixpkgs/trunk/latest-eval?compare=stdenv

to do the right thing.
2012-04-04 12:56:49 +02:00
Eelco Dolstra f52ca0c588 Add a redirect to the latest view result for which the underlying evaluation has finished completely
This will be useful for the Nixpkgs channel mirror script:

  http://hydra.nixos.org/view/nixpkgs/unstable/latest-finished/channel

is the channel containing the latest, consistent, tested set of builds.
2012-04-03 17:45:03 +02:00
Eelco Dolstra bd93ca9316 Add a redirect to the evaluation page of a view result
E.g.

  http://hydra.nixos.org/view/nixpkgs/unstable/latest/eval

Thus this is the channel representing the latest Nixpkgs for which the
elements of the view "unstable" succeeded:

  http://hydra.nixos.org/view/nixpkgs/unstable/latest/eval/channel
2012-04-03 15:45:48 +02:00
Eelco Dolstra 2c677ec71a Always record inputs passed through -I in the BuildInputs table
We currently have no way to determine if the Nix evaluator used a
specific -I input, so we need to record all of them as inputs.
2012-04-03 10:10:45 +00:00
Eelco Dolstra 30e2b9046a Cleanup 2012-04-03 11:28:59 +02:00
Eelco Dolstra db2b2b6134 Add a redirect to the latest finished jobset evaluation
The action .../jobset/<project>/<jobset>/latest-eval redirects to the
latest evaluation of the jobset that has no unfinished builds.  Thus,
for instance,

  http://hydra.nixos.org/jobset/nixpkgs/trunk/latest-eval/channel

is the channel containing the latest consistent set of Nixpkgs builds.
2012-04-03 01:30:54 +02:00
Eelco Dolstra 262f068e26 Support obtaining the contents of an evaluation as a channel
E.g. http://hydra.nixos.org/eval/552513/channel

The advantage of such a channel is that all builds come from the same
evaluation, and thus are consistent.
2012-04-02 23:27:17 +02:00
Eelco Dolstra 69e600da89 Allow comparing an evaluation with an arbitrary other evaluation
The URI parameter "compare=..." can denote either an arbitrary
evaluation ID, or the name of a jobset in the same project.  In the
latter case, the comparison is made against the latest completed
evaluation of the specified jobset.
2012-04-02 20:40:59 +02:00
Eelco Dolstra 2f9153c640 Prevent multiple builds with the same (job, outPath) tuple from being added
This happened in a pathological case in Nixpkgs: the "grub" job is
evaluated for i686-linux and x86_64-linux, but in the latter case it
returns the same derivation as in the former case.  So only one build
should be added.
2012-04-02 15:56:29 +00:00
Eelco Dolstra 9d4cb29e08 Show queued builds in jobset evaluation pages 2012-04-02 15:23:42 +00:00
Eelco Dolstra 427e5e8db8 Show new and removed jobs 2012-04-02 16:45:05 +02:00
Eelco Dolstra 662cdf0421 Add support for viewing jobset evaluations 2012-04-02 16:11:22 +02:00
Eelco Dolstra e1768cae86 Don't barf if the SQLite DB is missing
This prevented hydra-init from starting.
2012-03-19 03:57:11 +00:00
Ludovic Courtès 3846c2407d Fix URL in the "password changed" email. 2012-03-13 18:30:57 +01:00
Eelco Dolstra 1f268d2d43 Update isCurrent properly 2012-03-13 13:09:10 +01:00
Eelco Dolstra 179b012a8e Open the DB using Hydra::Model::DB->new
This gets rid of the openHydraDB function and ensures that we
open the database in a consistent way.

Also drop the PostgreSQL sequence hacks.  They don't seem to be
necessary anymore.
2012-03-13 12:10:19 +01:00
Eelco Dolstra 87e4d43848 Fix the jobset unchanged check
When checking whether the jobset is unchanged, we need to compare with
the previous JobsetEval regardless of whether it had new builds.
Otherwise we'll keep adding new JobsetEval rows.
2012-03-12 20:47:30 +01:00
Eelco Dolstra 27619f18e2 Re-enable the "Related Builds" tab
However, there is a "limit 1" on the JobsetEval search to prevent a
sequential scan of the Builds table.
2012-03-12 20:47:30 +01:00
Eelco Dolstra abe71a767b Disable prepared statements completely
Because of the way DBIx::Class does prepared statements, even
innocuous queries such

  $c->model('DB::Builds)->search({finished => 0})

can be extremely slow.  This is because DBIx::Class prepares a
PostgreSQL statement

  select ... from Builds where finished = ?

and since Builds is very large and there is a large fraction of rows
with "finished = 1", the PostgreSQL query planner decides to implement
this query with a sequential scan of the Builds table (despite the
existence of an index on "finished"), which is extremely slow.  It
would be nice if we could tell DBIx::Class that constants should be
part of the prepared statement, i.e.

  select ... from Builds where finished = 0

but AFAIK we can't.
2012-03-12 20:47:30 +01:00
Eelco Dolstra 2d1cf73974 Speed up channel processing
In particular the /pkg action is now O(lg n) instead of O(n) in the
number of packages in the channel, and listing the channel contents
no longer requires calling isValidPath() on all packages.

Derivations (and thus build time dependencies) are no longer included
in the channel, because they're not GC roots.  Thus they could
disappear unexpectedly.
2012-03-12 20:47:30 +01:00
Eelco Dolstra 9f10c0f9c0 Fix a reference to BuildResultInfo 2012-03-12 20:47:30 +01:00
Eelco Dolstra 07b3dffd20 Reduce I/O in build listings by only fetching required columns
Columns such as "longDescription" can be large, so fetching them
when they're not needed is wasteful.
2012-03-12 20:47:30 +01:00
Eelco Dolstra 47f877c5bb Evaluator cleanups
* Don't use isCurrent anymore; instead look up builds in the previous
  jobset evaluation.  (The isCurrent field is still maintained because
  it's still used in some other places.)

* To determine whether to perform an evaluation, compare the hash of
  the current inputs with the inputs of the previous jobset
  evaluation, rather than checking if there was ever an evaluation
  with those inputs.  This way, if the inputs of an evaluation change
  back to a previous state, we get a new jobset evaluation in the
  database (and thus the latest jobset evaluation correctly represents
  the latest state of the jobset).

* Improve performance by removing some unnecessary operations and
  adding an index.
2012-03-12 20:47:29 +01:00
Eelco Dolstra 8d65ab6158 Don't use a prepared statement for the active build steps query
Prepared statements are sometimes much slower than unprepared
statements, because the planner doesn't have access to the query
parameters.  This is the case for the active build steps query (in
/status), where a prepared statement is three orders of magnitude
slower.  So disable the use of prepared statements in this case.

(Since the query parameters are constant here, it would be nicer if we
could tell DBIx::Class to prepare a statement with those parameters
fixed.  But I don't know an easy way to do so.)
2012-03-12 20:47:29 +01:00
Eelco Dolstra 68a867da67 Merge the BuildResultInfo table into the Builds table 2012-03-12 20:47:29 +01:00
Eelco Dolstra 25334715f8 Merge the BuildSchedulingInfo table into the Builds table
This simplifies the code and improves performance since it reduces
the number of joins.
2012-03-12 20:47:29 +01:00
Eelco Dolstra 541238030d Provide a command ‘hydra-init’ to initialise/upgrade the database
For schema upgrades, hydra-init executes the files
src/sql/upgrade-<N>.sql, each of which upgrades the schema from
version N-1 to N.  The upgrades are wrapped in a transaction.
2012-02-28 20:16:16 +01:00
Eelco Dolstra b13664308c Whitespace 2012-02-28 15:27:44 +01:00
Eelco Dolstra 3d824b3a3a Indentation 2012-02-21 17:59:36 +01:00
Eelco Dolstra 578530dac2 Don't show duplicate builds in "Related builds"
Since a build may be a member of multiple jobset evaluations, we need
to do a "select distinct" here.  But maybe we should only show builds
from a single evaluation (e.g. the most recent), since showing builds
from several may be confusing.
2012-02-21 17:16:32 +01:00
Rob Vermaas 2cf9b148eb 50 for related builds might be a kind of low, will start with 100 2012-02-16 17:00:59 +01:00
Rob Vermaas 924d94cafd * minor performance tweaks
* added related builds tab which show related builds (builds that are in same evaluations), shows max 50
2012-02-16 16:56:01 +01:00
Rob Vermaas 355135b6e8 add links in admin page to clear queue (all non-running builds, and all non-running old (non-current) builds) 2012-02-16 15:31:12 +01:00
Rob Vermaas 8d78a688c7 is not in hydra-server's scope 2012-01-28 21:03:44 +01:00
Rob Vermaas 1c0cd99c3e remove old line 2012-01-28 20:55:33 +01:00
Rob Vermaas fded9e62af logdiff now support bzipped logs for logdiff 2012-01-28 20:47:01 +01:00